Move the production line

Want to hire us for your next job?

Please contact Sander or Luke. We will help you quickly!

info@pol-industrialmovements.com
+31 (0) 85-7600 318
De 2 eigenaren van Pol Industrial Movements: Sander Pol en Luke Pol

Do you have to move a production line and do you want to keep production running at the same time? Pol Industrial Movements helps you from plan to delivery, so you can continue with minimal downtime. As a total partner in industrial removals, we combine compact lifting, special transport and assembly/dismantling into one tightly coordinated process. In this article, you'll discover exactly what's involved, what to look out for and how to limit risks.

Why is moving the production line important for your company?

Moving a production line often involves growth, consolidation, an acquisition or the introduction of new technology. It is not an easy move: you have to deal with heavy components, tight spaces, tight windows and safety and regulatory requirements. The profit lies in smart preparation, good equipment and one coordinating party that connects all links. Pol Industrial Movements is one such party: we plan, lift, transport, install and deliver ready for production.

How do you move a production line step by step?

A successful move consists of clear phases. Step by step, we explain what we do, why we do it this way and what you notice about it.

  • Preparation: recording and planning First, we make a location recording and route plan, including floor load control, passages and lifting points. We draw up a lifting plan and a phasing (e.g. weekend or evenings) and coordinate with your technical service and any OEMs.
  • Disassembly and marking: keep everything traceable We ensure stress-free reporting, label every part and take photos so that we can rebuild faster and error-free later. Where necessary, we do a clean-down.
  • Lifting and moving internally: safe and precise With mini cranes, we work in tight spaces; truck-mounted cranes support unloading and unloading. We distribute loads carefully to protect your floor and machines.
  • Packaging and transport: skids, crates and fuses We package custom parts, protect against shocks and moisture and secure the load. Nationally or internationally: we arrange permits and escorts where necessary.
  • Repositioning, alignment and anchoring At the new location, we position, level and anchor the line exactly. We connect utilities (electricity, compressed air, water or process media) in coordination with your team.
  • Testing and Commissioning (SAT) We do functional checks and, if agreed, a Site Acceptance Test. You will receive clear delivery criteria and reports.

What does it cost to move a production line and what factors determine the price?

A fixed price without recording is difficult, but we make it predictable. This affects your costs and lead time:

  • Line size and complexity (number of modules, weight, precision requirements)
  • Accessibility (door widths, lifting heights, floor load)
  • Distance and border crossings (international transport)
  • Packaging requirements (skids, crates, cleanroom requirements)
  • Required permits and time windows (weekend/evening)
  • Test and qualification requirements (e.g. FAT/SAT)
  • OEM engagement and documentation

After a short recording, you will receive a transparent proposal with planning, phasing and deliverables.

How do you limit downtime and project risks?

  • Smart planning: phasing around your production windows and parallel preparation
  • Own equipment: mini cranes, truck-mounted cranes, aerial work platforms and lifting & home equipment for short lead times
  • One point of contact: a permanent project manager, day starts and clear milestones
  • Pre-tested: labels, checklists and a fallback scenario to avoid surprises

What does it give you?

  • Less downtime due to tight planning and parallel work
  • Reduced risk through a single coordination point and calibrated resources
  • Faster restart thanks to clear delivery and test criteria
  • Totally unburdened: from (dis) assembly and lifting to transport and temporary storage
Do you want to move your production line with minimal downtime? Request a free recording today. We will come by, assess the situation and deliver a clear plan with planning and cost estimation within a short time. Contact Pol Industrial Movements now and find out how fast your line is up and running again.

FAQs

How long does it take to move a production line?

That depends on the size, complexity, and your available downtime window. After a location recording, we provide a concrete schedule with clear milestones.

Do I need new CE documentation after relocation?

Sometimes a reassessment or addition is necessary, especially in case of changes. We will coordinate this with your OEM or a specialist.

Can you work outside production hours?

Yes. We plan evening, night and weekend windows to reduce downtime and allow the operation to continue.

Do you also arrange packaging and temporary storage?

Yes. We provide industrial packaging (skids/crates), cargo securing and can provide temporary warehousing.

Do you work across Europe?

Yes. We coordinate border crossings, permits and escorts and coordinate locally with your teams.

What do you need for a quote?

Photos or layouts, sizes/weights, access routes, utilities, desired planning and locations. After a recording, you will receive a sharp and transparent proposal.

Can you also do the lifting or transport alone?

Sure. You can use us for part of the process or as a total partner, whatever suits your organization.

Want to hire us for your next job?

We are happy to help you with your next logistical issue. Contact our planning team to schedule your next assignment.